Value Engineering

Alternate Source

  • Cross the part to other supplier; multiple sourcing strategy to address lead time & flexibility
  • Change the Epson crystal to other brand part cost saving 30%
  • Change the MCU supplier to direct manufacture and bander together with other project . Part cost saving 17%

Part Obsolescence Resolution

  • Footprint conversation for EOL part
  • Footprint conversion for logic IC
  • Part solution redesign
  • Change the resonator to crystal                                  

Redesign Solution

  • Redesign the solution and maintain the customer functionality spec
  • Use the wireless MCU to replace the Bluetooth module + MCU. Cost saving 30% compare original design
  • Change the MCU and redesign. Cost saving 35% compare with original design